diff options
Diffstat (limited to 'google/ads/googleads/v0/errors/date_range_error.proto')
-rw-r--r-- | google/ads/googleads/v0/errors/date_range_error.proto | 51 |
1 files changed, 0 insertions, 51 deletions
diff --git a/google/ads/googleads/v0/errors/date_range_error.proto b/google/ads/googleads/v0/errors/date_range_error.proto deleted file mode 100644 index cfb175d09..000000000 --- a/google/ads/googleads/v0/errors/date_range_error.proto +++ /dev/null @@ -1,51 +0,0 @@ -// Copyright 2018 Google LLC -// -// Licensed under the Apache License, Version 2.0 (the "License"); -// you may not use this file except in compliance with the License. -// You may obtain a copy of the License at -// -// http://www.apache.org/licenses/LICENSE-2.0 -// -// Unless required by applicable law or agreed to in writing, software -// distributed under the License is distributed on an "AS IS" BASIS, -// WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or -// implied. See the License for the specific language governing -// permissions and limitations under the License. - - -// Proto file describing date range errors. -syntax = "proto3"; - -package google.ads.googleads.v0.errors; - -option java_package = "com.google.ads.googleads.v0.errors"; -option java_outer_classname = "DateRangeErrorProto"; -option java_multiple_files = true; - -// Objective-C prefix. Google Ads API. -option objc_class_prefix = "GAA"; -option csharp_namespace = "Google.Ads.GoogleAds.V0.Errors"; -option php_namespace = "Google\\Ads\\GoogleAds\\V0\\Errors"; -option php_metadata_namespace = "Google\\Ads\\GoogleAds\\V0\\Errors"; - -// Container for enum describing possible date range errors. -message DateRangeErrorEnum { - - // Enum describing possible date range errors. - enum DateRangeError { - // Enum unspecified. - UNSPECIFIED = 0; - // The received error code is not known in this version. - UNKNOWN = 1; - // Invalid date. - INVALID_DATE = 2; - // The start date was after the end date. - START_DATE_AFTER_END_DATE = 3; - // Cannot set date to past time - CANNOT_SET_DATE_TO_PAST = 4; - // A date was used that is past the system "last" date. - AFTER_MAXIMUM_ALLOWABLE_DATE = 5; - // Trying to change start date on a campaign that has started. - CANNOT_MODIFY_START_DATE_IF_ALREADY_STARTED = 6; - } -} |